Food Storage Centre

Working with Dawnus Construction Limited on a Design and Build Contract to deliver a new Head Office for Castell Howell Foods. The new build construction, formed of a double portal frame steel structure, consisted of a frozen food store, dry goods store and a three-storey office structure.

Burroughs was responsible for many aspects of the building design which included floor slab; foundations; dock leveller pits and associated infrastructure works for the building; including car park and service yard that consisted of a fuel area and lorry wash and parking for over 40 lorries. The latest in vehicle tracking analysis software was used to develop the layout of the service yard, ensuring adequate circulation of both rigid and articulated vehicle types.