Upton-upon-Severn

Burroughs acted as Contractor’s Designer for a highways and drainage scheme to provide flood resilience to Upton-upon-Severn by replacing culverts and raising road levels for improved access to the town during flood events.

The highway (A4104) is located between Upton-upon-Severn and Holly Green. Burroughs have been responsible for designing flood conveyance structures accounting for remodeling of the River Severn Flooding Catchment. Burroughs prepared Approval In Principle (AIP) documentation, based on a 120 year design life, securing the necessary approvals for the scheme.

Burroughs were actively involved in the approach to phasing, through design and construction, working collaboratively with all stakeholders targeting a best value outcome.