Nantgaredig Pumping Station

Dwr Cymru Welsh Water (DCWW) required mechanical and electrical equipment to be replaced at Nantgaredig Raw Water Pumping Station.

Burroughs were commissioned to assess the existing structure, procure material tests and to analyse loading capacity of the structure to support new equipment. An extensive and detailed report was produced describing the permissible loadings and, where necessary, repair methods for any defects identified. Burroughs have undertaken a number of similar schemes working on behalf of DCWW.